Tuesday, 31st August – Maldives Transport and Contracting Company (MTCC) reports on the commencement of breakwater construction under Shaviyani atoll Foakaidhoo harbor project.
Furthermore, the contractor reports that the breakwater construction had kicked off on 15th August 2021.
Project scope includes dredging operations for the new harbor basin spanning 39,995 cubic meters along with 1800 cubic meters of dredging involved in the existing harbor basin. In addition to this, MTCC will dredging 4000 cubic meters of the harbor channel as well.
Additionally, the contractor will construct a 507 meter breakwater, a 100 meter revetment and a 464 meter quay wall.
Moreover, as part of the project components MTCC will develop a pavement of 2320 square meters along with installation of both navigation and street lights. The project value is a total of MVR52.7 million.