Close Menu
Maldives Business TimesMaldives Business Times
    What's Hot

    Government Expands Subsidized Fuel Stations for Fishermen to Nine Locations

    April 29, 2026

    State Recovers MVR 800M in Outstanding Revenue

    April 29, 2026

    Malé Hospitals Move to Strengthen Backup Power Capacity

    April 29, 2026
    Facebook X (Twitter) Instagram
    Friday, May 1
    Facebook X (Twitter) Instagram
    Maldives Business TimesMaldives Business Times
    • Home
    • Features

      Government Expands Subsidized Fuel Stations for Fishermen to Nine Locations

      April 29, 2026

      State Recovers MVR 800M in Outstanding Revenue

      April 29, 2026

      Malé Hospitals Move to Strengthen Backup Power Capacity

      April 29, 2026

      Minister Denies Political Motive Behind Gedhoruveriyaa Housing Delays

      April 29, 2026

      Dr. Ali Azwar Takes the Helm at STELCO as New Managing Director

      April 28, 2026
    • BUSINESS

      Government Expands Subsidized Fuel Stations for Fishermen to Nine Locations

      April 29, 2026

      Malé Hospitals Move to Strengthen Backup Power Capacity

      April 29, 2026

      Dr. Ali Azwar Takes the Helm at STELCO as New Managing Director

      April 28, 2026

      Government Targets 33% Renewable Energy Shift to Cut State Spending

      April 26, 2026

      MindCo Marks Girls in ICT Day with Consultative Session in Hulhumalé

      April 26, 2026
    • FINANCE
    • OPINION
    • TRAVEL & TOURISM
    • PUBLIC SECTOR
    • LIFE STYLE
    Maldives Business TimesMaldives Business Times
    Home » MTCC takes up Maafaru Int’l Airport development and expansion project

    MTCC takes up Maafaru Int’l Airport development and expansion project

    MTCC awarded second phase of Maafaru International Airport development and expansion project
    December 8, 20221 Min Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Maldives Transport and Contracting Company (MTCC) has been contracted with the second phase of Maafaru International Airport development and expansion.

    The project will reportedly cost MVR 443 million. MVR418 million of the total will be funded by Abu Dhabi Fund for Development (ADFD), remaining MVR25 million will be spent by state.

    MTCC Managing Director Adam Azim signed on behalf of the contractor, while Director General of Ministry of National Planning, Housing and Infrastructure (MNPHI) Fathimath Shana Farooq signed on behalf of the government.

    Project scope includes extending the runway by an additional 650 meters, widening the landing strip along with development of infrastructure. MTCC is expected to dredge for more land area, and will conclude the second phase with shore protection measures.

    Other components include upgrading the existing runway’s pavement, stretching the taxiway and upgrading the power system.

    Related Posts

    BUSINESS

    Government Expands Subsidized Fuel Stations for Fishermen to Nine Locations

    April 29, 2026
    BUSINESS

    Malé Hospitals Move to Strengthen Backup Power Capacity

    April 29, 2026
    BUSINESS

    Dr. Ali Azwar Takes the Helm at STELCO as New Managing Director

    April 28, 2026
    Leave A Reply Cancel Reply

    Don't Miss
    FINANCE

    State Recovers MVR 800M in Outstanding Revenue

    April 29, 2026

    The Maldives Inland Revenue Authority (MIRA) collected MVR 882 million in overdue state dues last…

    Malé Hospitals Move to Strengthen Backup Power Capacity

    April 29, 2026

    Minister Denies Political Motive Behind Gedhoruveriyaa Housing Delays

    April 29, 2026
    Demo
    Facebook X (Twitter) Instagram LinkedIn Telegram
    • Home
    • BUSINESS
    • PUBLIC SECTOR
    • TRAVEL & TOURISM
    © 2026 Maldives Business Times. by hyvemedia.

    Type above and press Enter to search. Press Esc to cancel.