Close Menu
Maldives Business TimesMaldives Business Times
    What's Hot

    STO Closes Q2 2026 with Net Profit MVR 280 mil, up 70%

    July 29, 2026

    Applications Open for MIB Guesthouse Awards 2026

    July 29, 2026

    State Receivables Hit MVR 14 Bil

    July 29, 2026
    Facebook X (Twitter) Instagram
    Thursday, July 30
    Facebook X (Twitter) Instagram
    Maldives Business TimesMaldives Business Times
    • Home
    • Features

      STO Closes Q2 2026 with Net Profit MVR 280 mil, up 70%

      July 29, 2026

      Applications Open for MIB Guesthouse Awards 2026

      July 29, 2026

      State Receivables Hit MVR 14 Bil

      July 29, 2026

      Maldives President Nominates Ambassador Thoriq as IRENA’s Permanent Representative

      July 28, 2026

      Govt. Allocates MVR 2.5 Bil for Next Year’s Council Block Grant

      July 28, 2026
    • BUSINESS

      STO Closes Q2 2026 with Net Profit MVR 280 mil, up 70%

      July 29, 2026

      Applications Open for MIB Guesthouse Awards 2026

      July 29, 2026

      Maldivian Becomes First Local Carrier Operating Twin Otter Classic 300-G

      July 23, 2026

      BML’s Aaya Update Enhances Mobile App and Internet Banking Convenience

      July 22, 2026

      BML to Transform Core Banking with Finastra

      July 21, 2026
    • FINANCE
    • OPINION
    • TRAVEL & TOURISM
    • PUBLIC SECTOR
    • LIFE STYLE
    Maldives Business TimesMaldives Business Times
    Home ยป STELCO cautions when installing metal, iron pipes over cables

    STELCO cautions when installing metal, iron pipes over cables

    STELCO cautions against installing metal bars, pipes and similar material on top of electrical cables
    March 25, 20241 Min Read
    Share
    Facebook Twitter LinkedIn Pinterest Email

    State Electric Company Limited (STELCO) has urged the public and stakeholders to practice caution while installing metal frames for campaign or other purposes in Greater Male’ region.

    According to STELCO, iron stands and other similar materials have been installed or placed over the 132kV cables; which are part of the Greater Male’ Interconnection Grid.

    The grid originates from STELCO powerhouse in Male’ City and runs from Usfasgandu area in the city, and through Sinamale’ Bridge up to the substation in Hulhumale’ powerhouse.

    STELCO further said the electricity consumed by Male’ City is distributed from Hulhumale’ via the interconnection grid, and that any damages to it would incur significant repairing costs.

    The utility provider further said that due to the network being energized, there is a high probability of people being electrocuted should they attempt to drill or install metallic pipes or similar materials.

    Related Posts

    BUSINESS

    STO Closes Q2 2026 with Net Profit MVR 280 mil, up 70%

    July 29, 2026
    Awards

    Applications Open for MIB Guesthouse Awards 2026

    July 29, 2026
    BUSINESS

    Maldivian Becomes First Local Carrier Operating Twin Otter Classic 300-G

    July 23, 2026
    Leave A Reply Cancel Reply

    Don't Miss
    Awards

    Applications Open for MIB Guesthouse Awards 2026

    July 29, 2026

    Applications are now open for the inaugural edition of the “MIB Guesthouse Awards 2026”. According…

    State Receivables Hit MVR 14 Bil

    July 29, 2026

    Maldives President Nominates Ambassador Thoriq as IRENA’s Permanent Representative

    July 28, 2026
    Demo
    Facebook X (Twitter) Instagram LinkedIn Telegram
    • Home
    • BUSINESS
    • PUBLIC SECTOR
    • TRAVEL & TOURISM
    © 2026 Maldives Business Times. by hyvemedia.

    Type above and press Enter to search. Press Esc to cancel.